| Bad Waltersdorf | ||||
| Football Centre in Bad Waltersdorf / Styria | ||||
| Use | ||||
| Football for professionals, amateurs and
youth Training camp for national league clubs and international teams (such as Arsenal London and Werder Bremen) |
||||
| Range of services | ||||
| Project control, cost management, cost
control, time management and time control for the sport facilities, technical planning, design, tendering process, on-site supervision of construction of sports and outdoor facilities (including sprinkling and floodlighting planning), soil mechanics supervision of building construction |
||||
| Project data | ||||
| Club building | ||||
| approx. 590 m² useable
floor space (approx. 1,000 m² construction surface area) 4 changing rooms, referee cubicle, first aid rooms, 1 gym (approx. 60 m²), office, club room, side rooms, storage rooms, equipment room. Technical room, canteen with storeroom and cold storage room (approx. 80 m²) |
||||
| Stands | ||||
| (covered, approx. 600 m²) 350 seats |
||||
| Sports facilities | ||||
|
|
Football pitch with
natural turf surface (main playing field), A = 8,590 m² With floodlighting and underfloor sprinkling (water from own well) |
|||
|
|
Football pitch with
natural turf surface (training field), A = 7,280 m² With floodlighting and underfloor sprinkling (water from own well) |
|||
| Outdoor facilities | ||||
| (approx. 600 m² asphalt
and approx. 9,400 m² gravel surface) Car park with approx. 350 parking spaces |
||||
| Project costs | ||||
| EUR 1,23 Million (excluding VAT) Including fittings and fixtures and 3,000 hours personal contribution by sports club, but not including the fitting out of the gym or grounds' costs |
||||
| Planning and design phase | ||||
| 06/1999 07/2000 | ||||
| Construction phase | ||||
| 07/2000 06/2002 | ||||
| Architecture: G. Mitterberger (Graz and Lienz / A) | ||||