Project management, cost management, cost
control, time management and time control for the sports and outdoor facilities,
planning, management of tendering process and on-site supervision of the sports and outdoor facilities construction (including irrigation and floodlight planning) |
||||
Project data | ||||
Club building | ||||
approx. 440 m² useable
floor space (approx. 450 m² construction surface area) 4 changing rooms, referee cubicle, showers, toilets, office for football, club room for Winter Sports Club, side rooms, equipment room. Technical room, canteen with storeroom and cold storage room (total area approx. 80 m²), terrace in front of canteen, approx. 170 m² made up area around the building |
||||
Stands (covered, approx. 340 m²) | ||||
250 seats, 300 standing places | ||||
Sports facilities | ||||
A small part of the main field (tournament pitch) is on a waste disposal site. The rest of the pitch is on a building rubble site. This increased the cost. | ||||
Football field
- Tournament pitch with natural turf surface 102x64 m, A = 7.344 m²
With floodlighting and underfloor sprinkling (water from own well) |
||||
Football field
- training area with natural turf surface 100x60 m, A = 6.784 m²
With floodlighting and underfloor sprinkling (water from own well) |
||||
Outdoor facilities | ||||
|
approx. 900 m² concrete area | (access road and area) | ||
|
approx. 2.700 m² gras-gravel area | (car park with approx. 100 parking spaces) | ||
|
approx. 480 m² grass area | (children's playground) | ||
Project costs | ||||
EUR 1,7 Mio. (not including VAT.) Including fittings and fixtures and 1.300 hours personal contribution, but not including grounds' costs |
||||
Planning phase | ||||
04/2003 - 05/2004 | ||||
Construction phase | ||||
07/2004 - 08/2005 | ||||
Architecture : Wallner GmbH Company (Kapfenberg / A) |