| Söding | ||||
| Sports and Leisure Centre of the municipality Söding / Styria | ||||
| Use | ||||
| Football, leisure sports | ||||
| Range of services | ||||
| General planning and design, project management, cost management, cost control, time management, time control | ||||
| Project data | ||||
| Club building | ||||
| approx. 314 m² useable
floor space (approx. 440 m² construction surface area): 4 changing cubicles, referee cubicle, first aid rooms, office, side rooms, equipment room. Technical room, canteen with storeroom and cold storage room (together approx. 60 m²), terrace in front of the canteen, approx. 280 m² made up area around the building |
||||
| Stands | ||||
| (covered, approx. 310 m²) 250 seats, 500 standing places |
||||
| Sports facilities | ||||
|
|
Football
pitch with natural turf surface, A = 7,129 m² With floodlighting and underfloor sprinkling (water from own well) |
|||
|
|
Beach volleyball, A = 400 m² | |||
|
|
Curling (3 lanes) and trend sports´ area, A = 600 m² | |||
| Outdoor facilities | ||||
|
|
approx. 600 m² asphalt surface (car park for 37 cars) | |||
|
|
approx. 1,800 m² gravel surface (car park for 90 cars) | |||
|
|
approx. 600 m² grass area (playground) | |||
|
|
approx. 100 m asphalt access road to the beach volleyball area | |||
| Project costs | ||||
| EUR 1,04 million (excluding VAT) including fittings and fixtures and 1,500 hours personal contribution by sports club, but excluding grounds' costs. |
||||
| Planning and design phase | ||||
| 04/2001 09/2002 | ||||
| Construction phase | ||||
| 03/2002 07/2003 | ||||
| Draft architecture: F.W. Kloiber (Voitsberg / A) | ||||
| Colour architecture: J. Walcher (Graz / A) | ||||